pLASTIC

Offering a variety of pLASTIC goods for all industrial Sectors

Copper Cathode

Offering Copper cathode for all Industrial Sectors

Monthly capacity: 5,000 MT.

Purity: Min 99.97%

Specs: See enclosed sheet

MOQ: Trial order 100MT. 

Monthly: 200MT

Country of Origin: DRC (Congo)

COMMODITY: Electrolytic copper cathodes-A (L.M.E. non-registered)

PURITY: 99.7% minimum

PACKING: Palletized, steel/aluminum bands

SIZE: 914mm x 914mm x 12mm

NET WEIGHT/SHEET 125 KG (+/- 1%)

No of sheets: 20 sheets per bundle

Net Weight per pallet: 2.2MT (+/- 1%)

Copper Millberry Scrap

Offering Copper Millberry Scrap for all Industrial Sectors

Monthly capacity: 6,000 MT.

Purity: Min 99.95% max 99.99%

Wire Diameter: 0.30mm, 0.25 mm, 0.20 mm

Tensile strength: 1000N/mm2, 900N/mm2, 500N/mm2, 450 N/mm2

MOQ: Trial order 100MT.

Monthly: 200MT

Processed and packed in: DRC (Congo)

Standard Operating Procedure (SOP)

  1. Buyer Issues LOI To Seller
  2. Seller Issues FCO To Buyer
  3. Buyer Signs FCO And Return To Seller With ICPO
  4. Seller Sends The Draft Of Contract – SPA- To Buyer
  5. Seller And Buyer Confirm Contract (SPA) And Procedure
  6. Seller And Buyer Sign Final Contract And Exchange (3) Copies
  7. Seller Sends To Buyer The Pro-forma Invoice (PI)
  8. Within Five (05) Working Days, Buyer Issues 100% Irrevocable, Confirmed, Operative, And Transferable Documentary Letter Of Credit (DLC MT700) or SBLC (MT760), From Top Prime Bank, Payable After SGS Inspection At Discharge Port
  9. Sellers Issue 2% PB in the form of SBLC
  10. Within 15 Days Of The Confirmation Of DLC MT700, Seller Start The Process of Loading, Issues All Documents (Pop Documents) to Buyer Bank and Sends Copies to Buyer by E-Mail. Buyer or its representative can be present during the Q&Q inspection at the loading port, under buyer’s expenses.
  11. The Delivery Time Is Estimated To 60 Days After Receiving And Confirming Of Banking Instrument From The Buyer’s Bank
  12. After Full Payment By MT103 At Destination Port To Seller’s Account, The Ownership will Be Changed On The Name Of Buyer.

What are you waiting for?

The world’s climate is not getting any better